| • Science | • People | • Locations | • Timeline |
Lines 1 and 3 are currently operated together with trains running through from Shonandai to Azamino. At 40.4 km, this is the second-longest subway in Japan after the Toei O-Edo Line in Tokyo.
The following lines are under construction:
Line 4 is scheduled for completion in 2007. It will form the first part of the planned Yokohama Ring Railway.
The missing Line 2 was supposed to connect Kanagawa-Shinmachi with Byobugaura, but it has been cancelled for time being.
The Yokohama High Speed Rail Company (横浜高速鉄道株式会社) is a semi-private consortium of Yokohama city, Kanagawa prefecture and the Tokyo Kyuko Electric Railway. They run the following subway line: