| • Science | • People | • Locations | • Timeline |
| Contents | ||
| Mission Insignia | |
|---|---|
| Mission Statistics | |
| Mission Name: | Apollo-Saturn 502 |
| Call Sign: | AS-502 |
| Launch: | April 4, 1968 12:00:01 UTC Cape Canaveral Complex 39A |
| Landing: | April 4, 1968 21:57:21 UTC 27° 40' N 157° 55' W |
| Duration: | 9 h 57 min 20 s |
| Number of Orbits: | 3 |
| Apogee: | 243.6 mi (392 km) |
| Perigee: | 127.4 mi (205 km) |
| Period: | 88.2 min |
| Inclination | 32.5 deg |
| Distance Traveled: | ~90,000 mi (~144,000 km) |
| Mass: | 36,932 kg CSM 25,138 kg LTA 11,794 kg |
| AS-502 | |
Apollo 6, launched in April 1968, was the Apollo program's last unmanned test flight of its Saturn V launch vehicle.
This was the final qualification flight of the Saturn V before its first manned flight ( Apollo 8). It was also the first mission to use High Bay 3 in the Vertical Assembly Building (VAB), Mobile Launcher 2 and Firing Room 2. Another objective was testing the Command Module re-entry system under extreme conditions simulating a worst-case return from the Moon. This objective was not met due to J-2 engine failures.
The S-IC first stage arrived by barge on 13 March, 1967 and was erected in the VAB four days later, with the S-IVB third stage and Instrument Unit computer arriving the same day. The S-IIThe S-II was the second stage of the Saturn V rocket. It was built by North American Aviation. Using liquid hydrogen (LH2) and liquid oxygen (LOX) it had five J-2 engines in a cross pattern. The second stage accelerated the Saturn V through the upper atmo second stage was two months behind them and so was substituted with a dumbbell shaped spacer so testing could proceed. This had the same height and mass as the S-II along with all the electrical connections. The S-II arrived 24 May. It was stacked and mated into the rocket on 7 July.
Testing was slow as they were still checking out the launch vehicle for Apollo 4Apollo 4 was the first unmanned flight of the Saturn V launch vehicle. It was also the first flight of the S-IC and S-II stages of the rocket. Objectives This was the first flight of the Saturn V, the largest launch vehicle ever constructed. It was also t, a limitation of the system where there wasn't two of everyone and everything. The VAB could handle up to four Saturn Vs but could only check out one at a time.
The Command and Service ModuleSpacecraft Modules The Apollo spacecraft was designed as part of the Apollo Program, by the United States in the early 1960's to land people on the moon before 1970 and return them safely to earth. It was made up of multiple units or modules that worked t arrived 29 September and was stacked 10 December. It was a hybrid, featuring the Command Module Number 20 and Service Module Number 14 after SM-020 was destroyed in a tank explosion and Command Module Number 14 was dismantled as part of the investigation into the Apollo 1 fire. After two months of testing and repairs the rocket was moved to the pad on 6 February, 1968.